Skip links
View Categories

Reports overview: a printable site or page report

2 min read

Opti-Behavior → Reports builds “a printable A4 report of your site or of one page: open it, print it or save it as PDF.” You choose what it covers in up to four steps, click “Generate the report”, and the report opens in a new tab.

Where to find it #

  • Opti-Behavior → Reports, in the “What to fix” group of the menu.
  • Or the “Site report” button at the top of the Traffic and Smart Insights screens: it opens Reports with the period you were looking at.

The steps #

StepWhat you chooseFree / Pro
1 “Report of”The whole site, or one pageWhole site Free; one page Pro
2 “Period”7, 30 or 90 days, or From / To datesFree
3 “Version”Short or Full (whole-site report only)Short Free; Full Pro
4 “Pages in annex”Pages whose full report is added at the endPro, Full version only

Generate, print, save as PDF #

  1. Click “Generate the report”. Under the button, before you click: “Opens in a new tab as an A4 page: print it, or save it as PDF.” After the click, the note becomes: “Building the report in a new tab. A full report with page reports takes up to 30 seconds.”
  2. In the new tab, use your browser’s Print (Ctrl+P, or Cmd+P on a Mac) and choose a printer or “Save as PDF”.

Under the form #

  • “For a client” (Pro, Business or Agency licence): your client’s name, your notes and your agency brand on the report.
  • A box “Add “Made with Opti-Behavior” at the bottom of my reports”, unticked unless you tick it (in Pro, shown only when Agency mode is on).

Expected result #

A new tab with an A4 report for the period you chose, ready to print or save as PDF.

FAQ #

The button is greyed out. #

The site has no visit recorded yet: “A report needs at least one day of visits.” Come back after the first day of tracking.

Are spam visits in the report? #

The line under the period says it: “Spam visits are left out.” or “Spam visits are counted.”, following the screen you came from. By default they are left out.

Is this the same as the e-mail report? #

No. Scheduled email reports send a summary on a schedule; Reports builds a document when you ask for it.

Related articles #

Leave a comment

Explore
Drag